SITU ADU
SITU
Exterior Rendering
$220,000 - $280,000
Studio
1 Bathroom
280 sq. ft.
Project Information
ADU Type
Detached
Building Shape
Rectangular
Square Footage
280 sq. ft.
Width Maximum dimension of the building exterior
14 ft
Length Maximum dimension of the building exterior
20 ft
Building Height Maximum dimension including apex of any pitched roofs
15 ft
Ceiling Height Living Space
13.5 ft
Ceiling Height Bathroom
7 ft
Ceiling Height Sleeping Space
13.5 ft
Business Information
Business Name
SITU
Business Designation
Not Applicable
Business Location
Brooklyn, NYBrooklynNY
design@situ.nyc
Phone Number
718 855 2170
Registered Design Professional (RDP)
Michael Jerome Brotherton (Story Architecture PLLC)
Email of Registered Design Professional
Not Applicable
Phone Number of Registered Design Professional
Not Applicable
Estimated Cost
What is the current lowest total estimated construction cost of the ADU?
$220,000$220000
What is the current highest total estimated construction cost of the ADU?
$280,000$280000
Project Components
Appliances
Dishwasher
Refrigerator
Construction Type
Pre-fabricated
Architectural Features
Not Applicable
Style
Contemporary
Material and Finishes
Primary Structural System Material
Not Applicable
Facade Material
Wood
Kitchen Flooring
Wood
Bathroom Flooring
Tile
General Flooring
Wood
Certifications
LEED v4.1 Residential: Single Family Certification
No
Passive House Certification
No
Zero Energy Ready Home (ZERH)
No
ENERGY STAR (75 or higher on EPA's 1–100 scale)
No
Other
No
Accessibility
Is the ADU designed with architectural barriers such as steps at the entrance or between rooms?
No
Is the ADU designed with assistive railings (grab bars) installed in the bathroom?
No
Is the ADU designed to accommodate a wheelchair users?
No
Sustainability Features and Certifications
For sustainable design practices, please refer to existing city guidelines and standards such as:
- HPD Design Guidelines for New Construction
- New York City, Environmentally Preferable Purchasing (EPP), Minimum Standards for Construction
- Clean and Circular: Design and Construction Guidelines (NYCEDC)
Mechanical Systems and Building Envelope
Is the ADU designed to incorporate a heat pump that operates with higher-than-minimum equipment efficiencies according to HPDs Electric Heating Policy?
Yes
Is the ADU designed to incorporate drain-water or wastewater heat recovery?
No
Does the ADUs insulation exceed the minimum requirements for New York City Energy Conservation Code (NYCECC)?
Yes
Is the ADU designed to harvest, treat, and reuse greywater to meet a portion of the project’s non-potable water needs?
No
Is the ADU designed with windows with a U-Factor of ≤ 0.27?
Not Applicable
Is the ADU designed with windows with a Solar Heat Gain Efficient (SHGC) of ≤ 0.4?
Yes
What is the Window to Wall Ratio (WWR) of the ADU?
12 %
Material Sourcing and Circularity
Is the ADU design specified to use building materials or products have been extracted, harvested or recovered, as well as manufactured within a 500-mile radius of the project site?
Yes
If the ADU is designed to use wood as a construction material, is it designed to use wood from a sustainable forest?
Yes
If the ADU is designed to use concrete as a construction material, is it designed to use low-carbon concrete?
Not Applicable
If the ADU is designed to use steel as a construction material, is it designed to use recycled steel and/or steel from electric arc furnaces (EAFs)?
Not Applicable
$220,000 - $280,000
Studio
1 Bathroom
280 sq. ft.
Project Information
ADU Type
Detached
Building Shape
Rectangular
Square Footage
280 sq. ft.
Width Maximum dimension of the building exterior
14 ft
Length Maximum dimension of the building exterior
20 ft
Building Height Maximum dimension including apex of any pitched roofs
15 ft
Ceiling Height Living Space
13.5 ft
Ceiling Height Bathroom
7 ft
Ceiling Height Sleeping Space
13.5 ft
Business Information
Business Name
SITU
Business Designation
Not Applicable
Business Location
Brooklyn, NYBrooklynNY
design@situ.nyc
Phone Number
718 855 2170
Registered Design Professional (RDP)
Michael Jerome Brotherton (Story Architecture PLLC)
Email of Registered Design Professional
Not Applicable
Phone Number of Registered Design Professional
Not Applicable
Estimated Cost
What is the current lowest total estimated construction cost of the ADU?
$220,000$220000
What is the current highest total estimated construction cost of the ADU?
$280,000$280000
Project Components
Appliances
Dishwasher
Refrigerator
Construction Type
Pre-fabricated
Architectural Features
Not Applicable
Style
Contemporary
Material and Finishes
Primary Structural System Material
Not Applicable
Facade Material
Wood
Kitchen Flooring
Wood
Bathroom Flooring
Tile
General Flooring
Wood
Certifications
LEED v4.1 Residential: Single Family Certification
No
Passive House Certification
No
Zero Energy Ready Home (ZERH)
No
ENERGY STAR (75 or higher on EPA's 1–100 scale)
No
Other
No
Accessibility
Is the ADU designed with architectural barriers such as steps at the entrance or between rooms?
No
Is the ADU designed with assistive railings (grab bars) installed in the bathroom?
No
Is the ADU designed to accommodate a wheelchair users?
No
Sustainability Features and Certifications
For sustainable design practices, please refer to existing city guidelines and standards such as:
- HPD Design Guidelines for New Construction
- New York City, Environmentally Preferable Purchasing (EPP), Minimum Standards for Construction
- Clean and Circular: Design and Construction Guidelines (NYCEDC)
Mechanical Systems and Building Envelope
Is the ADU designed to incorporate a heat pump that operates with higher-than-minimum equipment efficiencies according to HPDs Electric Heating Policy?
Yes
Is the ADU designed to incorporate drain-water or wastewater heat recovery?
No
Does the ADUs insulation exceed the minimum requirements for New York City Energy Conservation Code (NYCECC)?
Yes
Is the ADU designed to harvest, treat, and reuse greywater to meet a portion of the project’s non-potable water needs?
No
Is the ADU designed with windows with a U-Factor of ≤ 0.27?
Not Applicable
Is the ADU designed with windows with a Solar Heat Gain Efficient (SHGC) of ≤ 0.4?
Yes
What is the Window to Wall Ratio (WWR) of the ADU?
12 %
Material Sourcing and Circularity
Is the ADU design specified to use building materials or products have been extracted, harvested or recovered, as well as manufactured within a 500-mile radius of the project site?
Yes
If the ADU is designed to use wood as a construction material, is it designed to use wood from a sustainable forest?
Yes
If the ADU is designed to use concrete as a construction material, is it designed to use low-carbon concrete?
Not Applicable
If the ADU is designed to use steel as a construction material, is it designed to use recycled steel and/or steel from electric arc furnaces (EAFs)?
Not Applicable


